TITLE :
Design and build the main structure of the project.
OBJECTIVE :
To build the projects.
To get the best design for hydro generator.
To get the material for the actual design
CONTENT:
I went to the half cut shop, hardware, motorcycle shop,grocery, fishing shop, bicycle shop buy the things that needed to build the main and overall structure of my projects. Below are the lists of the thing I bought from the hardware, grocery shop ets.
1. Ex5 cover clutch
2. Spoons
3. Ball Bearings
4. Angle Bar
5. Jointer of the angle bar
6. Bolts and nuts
7. Hose pipe
8. Pipe and accessories
9. Spray
10. Aquarium (plastic)
11. Chain
12. Gear
13. Flywheel gear
All the listed items are not all of them are easy to find, it take time to go survey and finding all the items .After all the items i have. then i proceed to do the next step.
|
Angle bar |
With the angle bar and the accessories that i bought, now im going to cut them join them with the jointer, bolt and nuts. It is not easy to cut them with the saw, it really sweats me a lots. i have to measure all them to make it perfectly accurate to the size or else it will not give me the right size. Besides, it will give some difficulties to joint each other.
|
The structure of the design |
CONCLUSION:
After all the hardship to find the item and build it, now i can see almost the actual of the project. from now i can proceed to next step which are combing all the items together. But some of the items need to do through welding shop.